\\ Design-Build Project, Replacement of 5 Bridges to Perform Flood Remediation
Construction Inspection and Quality Assurance Services for Design-Build D900049, The Replacement of 5 Bridges to Perform Flood Remediation in Region 8
The scope of work included inspection of five bridge replacements, as well as addressing flooding issues in the areas of the bridges located in Westchester County at these locations: Route 1 over the Mamaroneck River; Saw Mill River Parkway NY Route 987D Flood Mitigation in Mount Pleasant; and Hutchinson River Parkway Flood Mitigation in the Vicinity of East Lincoln Avenue.
Key Features:
- Bridge rehabilitation and replacement
- Retaining wall installation and culvert replacements
- Traffic signal and guide rail replacement
- Work Zone Traffic Control
- Parkway and local street reconstruction and stabilization